715-394-0523

Home

5658 East County Road Z South Range, WI 54874

ParklandSanitaryDistrict@yahoo.com

Monday and Wednesday's from 9:30 AM to 1:00 PM


Water Saving Tips

Check every faucet in the house for leaks. A single dripping faucet can waste more water in a single day that one person needs for drinking in an entire week. Don't wait to fix a drip. Do it now!

Saving in the Kitchen

Store drinking water in the refrigerator rather than letting the tap run, when you want a cold glass of water.

Don't let the faucet run when you scrub vegetables or prepare other foods. Put a stopper in the sink instead.

Do not use running water to thaw meat or other frozen foods. Defrost food overnight in the refrigerator or use a defrost setting on a microwave.

Fill dishwasher full because it will use the same amount of water for a normal cycle, whether it contains a full load of dishes or just a few items.

When purchasing a new dishwasher, select water and energy efficient models.

If you wash dishes by hand, don't leave water running for rinsing.

Garbage disposal requires lots of water to operate properly. Start a compost pile! Composting scraps will also reduce demand on out landfills and wastewater facilities.

Saving in the Bathroom

Don't let the water run while brushing your teeth or shaving.

Never use your toilet as an ashtray or wastebasket.

Install water saving shower heads and ultra-low flush toilets.

Limit the length of your shower to five minutes or less. Reducing shower time by one minute can save 1,000 gallons of water a year.

Use the minimum amount of water needed for a bath by closing the drain first and filling the tub only 1/3 full.

Recycle and save water at the same time. Fill a plastic, quart-sized milk container with water and put it in your pre-1994 toilet tank, safely away from the operating mechanism. The jug can displace 10 gallons or more of water a day. Bricks are no longer recommended  since they can disintegrate over time and cause jams in plumbing. Be careful not to place the bottles where they will jam the flushing mechanism and make sure you don't displace so much water that you have to double flush. Double flushing wastes more water than you would save!

Saving in the Laundry Room

Use full loads of laundry whenever possible.

Preset washer levels for small, medium, or large loads appropriate for the size of laundry,

When purchasing new washing machines, select water and energy efficient models.

MEETINGS

Monthly meeting is held the 2nd Monday of each month at 5:30 pm. The meeting site is the Parkland Town Hall. 

.


MINUTES


  • DATE

    TEXT

  • DATE

    TEXT


BUDGET


  • YEAR

    BUDGET

  • YEAR

    BUDGET


CONTACTS

Parkland Sanitary District No.1

Emergency Number: 715-817-1930

5658 East County Road Z

P.O. Box 68

South Range, Wi 54874

Phone Number: 715-394-0523

President: Dean Grandquist

Secretary: Laurisa Richardson

Treasurer: Chris ST. Marie

Clerk: Jen West

Collections System Operator: Josh Johnson

Collections System Operator, Casual: Chris St. Marie



NOTIFICATIONS


Delinquent Fees

        November Yearly, delinquent fees will be placed on the tax rolls for collection.

2017

The Parkland Sanitary District is required to pay high monthly fees in order to allow customers to pay their monthly sewer bills using a credit or debit.  Effective January 1, 2017, the District will no longer collect payments by use of credit and debit cards.

However, you can now pay your monthly sewer invoice amount using your paypal account!!



ABOUT US

The Parkland sanitary District is located south of Superior Wisconsin and serves approximately 334 customers within its district boundaries. At the time of the districts creation, wastewater treatment in homes and businesses was accomplished y individual septic systems and holding tanks. A significant number of theses septic systems were failing resulting in odor in the area. The tight clay soil, numerous wetlands, and high groundwater table made replacement of the individual septic systems with code compliant systems difficult, and when possible, expensive to install. Thus many homes would have been forced to rely on holding tanks with associated pump out costs. The relatively small size of the community limits the ability of the district to raise funds for the construction and operation of a new wastewater collection and treatment system.

In addition, the District desired to have a method to bill each individual user for the volume of wastewater generated at each user location. The District also had to monitor flows of discharge to the City of Superior collection system (for billing purposes) and comply with the City of Superior's requirement to cease flow of storage if tanks in the City's collection system were full.

While working with the District through a facility planning process, MSA determined that the most cost effective solution was to design and construct a low pressure sewer collection system and pump to the nearby City of Superior. An agreement between the City and Sanitary District was signed with a stipulation that a holding basin be included in the Parkland system. The holding basin will store waste water during peak storm events when the City temporarily can not accept flows due to capacity limitations in the City's collection system. The new systems includes over 92,000 lineal feet of low pressure sewer, a 1 million gallon holding basin; four lift stations and a new District garage.

To address the District's desire for an individual billing system, an automated control and billing system with real time monitoring of more that 334 grinder stations and the total flow to the City of Superior was designed. The system is a multi-level secure wireless Supervisory Control and Data Acquisition (SCADA) system. This system tracks usage at each of the 334 site and creates proportional invoices automatically. The SCADA system has features like remote access and control by use of Smart Phones. Total flow measurement was provided by a magnetic flow meter meeting the City of Superior requirements and real time flows are transmitted to the City.

The District obtained a 2.34 million dollar grant from the Army Corp of Engineers and a 4.8 million dollar grant from Rural Development for the project. Grant funding covered approximately 67% of the 10.6 million dollar total project cost, adding no upfront cost to homeowners. Construction on this project is near completion.

Send us an Email

Please provide your details below. We will respond during the sanitary districts office hours.
Name E-mail Message Submit